|
Tennessee Valley Authority
REMCO has had a favorable business relationship with
TVA since 1965. We have received favorable supplier performance ratings
and have developed several long term relationships with TVA personnel.
REMCO has participated successfully in the present “open release”
contract with TVA and looks forward to a continued mutually beneficial
relationship.
REMCO has successfully completed many projects for TVA.
The following are examples:
Kingston > Failure of 1750hp
Parson Peoples motor. REMCO responded on Sunday to failed motor event,
dismantled unit, installed spare stator, reassembled and returned on
rush basis. We also performed a rewind on the spare stator.
Kingston > 1750hp motor vibrating
and making noise. On site disassembly of the 1750hp motor, evaluation
and assessment of motor, diagnosed alignment problem, laser aligned
motor, smooth operation when restarted.
Bull Run > 450hp motor wrecked
mechanically, REMCO fabricated all new brass lab., seals, resurfaced
journals, rebabbitted bearings, reassembly.
Bull Run > Main generator exciter
arcing on one brush arm. REMCO dismantled field, drop tested fields,
located shorted field, removed on-site, rewound, reinstalled, and reassembled
on site. 5 year arcing problem on exciter resolved.
Colbert > 3 each 2000hp boiler
feed pump motors. REMCO personnel removed motors on-site, returned to
shop, rebuilt motors, reinstalled 3 each 200hp motors on site, laser
aligned units, provided start up assistance during outage.
Norris > Generator #2 rotor
bar failure. REMCO personnel removed old rotor bars and shorting rings
on 50 ton rotor, furnished and installed all new rotor bars, shorting
rings, braze, clamp and paint 30’ diameter rotor.
Rather than list more repairs it is worth mentioning
that due to our prior relationship with National Electric Coil, our
shop personnel have been exposed to many TVA generator rewinds. Many
units are generating today with windings REMCO technicians installed.
We still routinely, provide (turbine/generator) (inspection/repair)
service for the following: Tapoca (Alcoa Power Co.), Lenzing Fibers,
Willamette Paper, Blue Ridge Paper, and Yadkin Power.
Over the years, REMCO technicians have experienced and
supervised much more than the average motor shop technician. We have
primarily worked for the facilities on the East side of the TVA system,
however, due to our independent status and having no sister shop in
Nashville, we are quoting 9 TVA locations. We look forward to expanding
our coverage area and relationships with TVA for another 42 years.
Projects completed in the last 3 years:
Major Projects
A.
Lenzing Fibers – Harold Fellers Powerhouse Superintendent
Disassembly and inspection of Allis Chalmers 5 Megawatt Turbine Generator.
Complete teardown of unit #11 turbine and generator which has operated
successfully since REMCO performed the same job in 1994. Project included
re-wedging generator, repairing generator air coolers, re-babbitting
of all bearings, mechanical repairs to 8 each axualary pieces. Total
project cost $246,000. REMCO has successfully provided teardown, inspection
and necessary repairs of their 4 each (5 Megawatt) turbine generators
since 1992.
Lenzing sells power to TVA in peak demand times (Winter and Summer).
B.
REMCO as a member of TWWA has performed repairs to 16 each power, water,
and waste water plants across the East Tennessee area. Routine repairs
primarily consist of the removal, repair, and re-installation of motors,
pumps, blowers, and gear boxes. A representative list of references
are as follows:
City of Alcoa – Ken Reynolds,
Plant Manager
City of Maryville – Rick Treatham, Maintenance
Manager
KUB (Knoxville Utility Board) – David Wolfenbarger,
Manager
LCUB – Bradley Denton, Maintenance
City of Loudon – John Davis, Manager
City of Rockwood – Rod King, Manager
City of Newport – Linton Atkins, Manager
West Knox Utility Board – Ron Medley, Maintenance
City of Greenville – Ken Earl, Superintendent
City of Kingsport – Ronnie Cook, Superintendent
C.
Willamette Paper and Blue Ridge Paper –
recent generator inspection within the last 3 years. Various repairs
including mechanical repairs were completed with successful results.
Lindsay Harp - Willamette Paper
Gary Ogles - Blue Ridge Paper
D.
Tapoca Power – On-site ice blasting and
inspection of Santella Generator.
Jeff Brown, Electrical Engineer Tapoca Power
E.
Tapoca Power – On-site machining of flashed
over generator slip rings. This occurred at 2 different locations within
a 3 week span. Failure analysis was performed. We determined that old
worn constant pressure brush holders, most likely contributed to these
failures. REMCO in both cases, dispatched technicians to field machine
the slip rings and return the generators to service.
Jeff Brown, Electrical Engineer Tapoca Power
Partnering Projects
A.
Arch Chemicals – Butch Smith Engineering
Electrical Representative REMCO provides repair services and consigned
motor stock for this customer. Arch has reduced their inventory because
of the consigned REMCO motor stock. Since they are 1 hour away the consigned
motor stock benefits both parties. B.
Aluminum Company of America (ALCOA) - Leon Trundle
REMCO has a successful contract with ALCOA for the repair/ replacement
of electric motors. This agreement involves pre-determined new motor
costs, maximum repair versus new cost percentage, and strict repair
specifications provided by ALCOA. We are presently in our 4th year with
positive results as reported by ALCOA. Benefits include; local supplier
and inventory reduction via REMCO stock.
Partnering benefits equal a win-win situation for both parties.
C.
A.E. Staley - Doug Ford
Similar agreement as previously mentioned with ALCOA. 24 hour a day
repair service, preset new motor purchase price, preset maximum repair
percentage based on new motor price, and REMCO stock of “T”
frame motors reduces the need for on hand customer inventory.
D.
Rubbermaid – Jim Rogers
Same repair / replace / stock agreement as previously mentioned in the
ALCOA and A.E. Staley partnering projects.
|